UI/UX design & prototyping Rising
Magic Patterns
AI design tool that turns prompts into production-ready UI
Key features
- Real-time collaboration
UI/UX design & prototyping Category leader
Collaborative interface design in the browser
Visit FigmaFigma is a design tool for interfaces and prototypes, with real-time collaboration and shared component libraries. It has a free plan and paid plans for teams.
From the vendor's own site. Not yet verified by SoftScout. A missing item may just mean we haven't confirmed it.
UI/UX design & prototyping Rising
AI design tool that turns prompts into production-ready UI
Key features
UI/UX design & prototyping Category leader
Open-source design platform for design and code teams
Key features
UI/UX design & prototyping Category leader
Native Mac and web interface design with real-time collaboration
Key features